Subject Search List
Subject Search
Accident
Advertising
Aerial View
Artwork
Ash Pit
Automobile
Avalanche
Baggage Cart
Boat
Bridge
Bridge-Highway
Bridge-Log
Bridge-Plate Girder
Bridge-Stone
Bridge-Trestle
Bridge-Truss
Buggy-Horse
Builders Photo
Building
Buildings
Bus
Business Card
Caboose-Steel
Caboose-Wood
Call Light
Cannery
Car
Car-Auto
Car-Auto Carrier
Car-Auto Rack
Car-Baggage
Car-Box
Car-Box Steel
Car-Box Wood
Car-Business
Car-Caboose
Car-Chip
Car-Coach
Car-Dynamometer
Car-Flat
Car-Flat Center Beam
Car-Flat-Bulkhead
Car-Freight
Car-Gondola
Car-Grain
Car-Hopper Covered
Car-Hopper Open
Car-Hopper Ore
Car-Interurban
Car-Log
Car-Mail & Express
Car-Odd Load
Car-Outfit
Car-Passenger
Car-Phosphate
Car-Refrig Ice
Car-Refrig Mechanical
Car-Refrigeration
Car-Rotary
Car-Schnabel
Car-Shops
Car-Sleeper
Car-Stock
Car-Tank
Car-Work Outfit
Card-Business
Catenary
Christmas Card
Cityscape
Coal dock
Construction
Containers
Coupler
Crane
Crossing Tower
Dam
Depot-Combination
Depot-Passenger
Depot-Telegraph
Depot-Train order
Display
Ditcher
Dock-Coal
Drawbridge
Equipment-Construction
Equipment-Electrical
Equipment-Washing
Farm Implements
Fence
Ferry
Fire
Flood
Flume
Form NP
Garden
Grade Crossing
Grain Elevator
Handcar-velocipede
Headlight-Electric
High-Wide
Highway Equipment
Horse
House-Freight
House-Ice
House-Power
House-Sand
House-Section
House-Speeder
Junction
Lake
Landmarks
Landscape
Landslide
Loading Shed
Locomotive
Locomotive-Crane
Locomotive-Diesel
Locomotive-Display
Locomotive-Electric
Locomotive-Exhaust
Locomotive-Gas
Locomotive-Geared
Locomotive-Helper
Locomotive-Miscellaneous
Locomotive-Model
Locomotive-Servicing
Locomotive-Shop
Locomotive-Shops
Locomotive-Snowplow
Locomotive-Steam
Locomotive-Stored
Locomotive-Tank
Locomotive-Tender
Locomotive-Terminal
Log Loader
Logs
Lumber
Machinery
Miscellaneous
Motor Car
Motorcycle
Mountains
Narrow-Gauge
Ocean Liner
Parade
People Walkway
People-Bystanders
People-Onlookers
People-Passengers
People-Personage
People-Railroad Crew
People-Railroad Officials
People-Switchtender
People-Workers
Pile Driver
Plant-Paper
Plant-Talc
Plow-Snow Rotary
Plow-Snow Wedge
Port Facilities
Port Pier
Relay Office
River
Roundhouse
Sand Bin
Sawmill
Semaphors
Shed-Car
Shed-Coal
Shed-Sand
Shed-Snow
Ship
Shovel
Siding
Sign
Signal-Bridge
Signal-Equipment
Signal-Semaphore
Signal-Target
Signal-Train Order
Snow
Snow and Ice
Snowplow pilot
Speeder
Speeder-Flats
Station
Station-Combination
Station-Passenger
Steam Shovel
Steamship
Structure
Structures
Sugar Beets
Switch
Switch Stand
Tank-Oil
Tank-Water
Telegraph Office
Telltale
Tie Plant
Tower-Interlocking
Town
Track-Crossover
Track-Diamonds
Track-Maintenance
Track-Rail
Track-Switch
Track-Switches
Track-Tie
Tracks
Trailer
Train Order
Train-Circus
Train-Freight
Train-Interurban
Train-Mail
Train-Maintenance
Train-Meet
Train-Mixed
Train-Passenger
Train-Rail
Train-Switching
Train-Troop
Train-Work
Trestlework
Truck
Truck-Delivery
Truck-Flat Bed
Truck-Highway Box
Truck-Tank
Tunnel
Turning Loop
Turntable
Vehicle-Bus
Vehicle-Horse drawn
Warehouse
Washout
Water Column
Water Pan
Water tank
Waterfront
Wheels
Wrecker
Wye
Yard
Yard Office
Yard-Classification
Yard-Freight
Yard-Hump
Yard-Office
Yard-Passenger
Home Menu
Subject Search
   The Ron V. Nixon Collection
     Subject Search - Track-Rail - 388 Records Found
  Results 181 - 190 of 39 pages Page 19 of 39
back 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 next
Click Image to Enlarge Image Record Data - RVN09624
Date: March 06, 1946 
Location: Drummond, MT
Photographer: Ron V. Nixon
Railroad: Northern Pacific Railway
Caption: "Extra 5121 West rear-ended the main line local, Extra 1816 West, at Drummon, MT. This accident resulted indirectly from the events surrounding the derailment of wrecker 47 east of Missoula (see RVN09581-09595). Missoula engineer Charles F. Reinke and his fireman had been on a layover in Helena when they were called to take Helena wrecker no. 37 to Missoula to help re-rail wrecker 47. In the meantime, officials decided to use a small wrecker from the Missoula car shop to assist wrecker 27 for that job, so Reinke and his fireman were stopped at Garrison and sent back to Helena. Then, after returning to Helena, they were called short of their legal rest period to handle Extra 5121 West. According to railroad officials, as Reinke approached Drummond he and his fireman had probably fallen asleep and missed block signals protecting the rear of Extra 1816 West. Extra 1816 West's conductor looked out the back of his caboose just in time to see the high speed approach of Extra 5121 West, so he ran into the nearby field. His brakemen were already on the ground giving signals for switching moves they were making at Drummond. The big Z-7 4-6-6-4 type locomotive plowed into the local's wooden caboose at high speed. There were only minor injuries to the crews involved. Conductor Emil Berglin was in charge of Extra 5121 West. Engineer Elmer Walkup and Conductor Malcom McCauley were handling the local."
Click Image to Enlarge Image Record Data - RVN09633
Date: March 09, 1946 
Location: Drummond, MT
Photographer: Ron V. Nixon
Railroad: Northern Pacific Railway
Caption: "Extra 5121 West rear-ended the main line local, Extra 1816 West, at Drummon, MT. This accident resulted indirectly from the events surrounding the derailment of wrecker 47 east of Missoula (see RVN09581-09595). Missoula engineer Charles F. Reinke and his fireman had been on a layover in Helena when they were called to take Helena wrecker no. 37 to Missoula to help re-rail wrecker 47. In the meantime, officials decided to use a small wrecker from the Missoula car shop to assist wrecker 27 for that job, so Reinke and his fireman were stopped at Garrison and sent back to Helena. Then, after returning to Helena, they were called short of their legal rest period to handle Extra 5121 West. According to railroad officials, as Reinke approached Drummond he and his fireman had probably fallen asleep and missed block signals protecting the rear of Extra 1816 West. Extra 1816 West's conductor looked out the back of his caboose just in time to see the high speed approach of Extra 5121 West, so he ran into the nearby field. His brakemen were already on the ground giving signals for switching moves they were making at Drummond. The big Z-7 4-6-6-4 type locomotive plowed into the local's wooden caboose at high speed. There were only minor injuries to the crews involved. Conductor Emil Berglin was in charge of Extra 5121 West. Engineer Elmer Walkup and Conductor Malcom McCauley were handling the local. This view, looking west and taken a few days after the accident, shows at least one main track restored to service as cleanup continues. The cars in the foreground are from the Extra 5121 West. Locomotive no. 5121 is being re-railed by the wrecker in the distance."
Click Image to Enlarge Image Record Data - RVN09634
Date: March 09, 1946 
Location: Drummond, MT
Photographer: Ron V. Nixon
Railroad: Northern Pacific Railway
Caption: "Extra 5121 West rear-ended the main line local, Extra 1816 West, at Drummon, MT. This accident resulted indirectly from the events surrounding the derailment of wrecker 47 east of Missoula (see RVN09581-09595). Missoula engineer Charles F. Reinke and his fireman had been on a layover in Helena when they were called to take Helena wrecker no. 37 to Missoula to help re-rail wrecker 47. In the meantime, officials decided to use a small wrecker from the Missoula car shop to assist wrecker 27 for that job, so Reinke and his fireman were stopped at Garrison and sent back to Helena. Then, after returning to Helena, they were called short of their legal rest period to handle Extra 5121 West. According to railroad officials, as Reinke approached Drummond he and his fireman had probably fallen asleep and missed block signals protecting the rear of Extra 1816 West. Extra 1816 West's conductor looked out the back of his caboose just in time to see the high speed approach of Extra 5121 West, so he ran into the nearby field. His brakemen were already on the ground giving signals for switching moves they were making at Drummond. The big Z-7 4-6-6-4 type locomotive plowed into the local's wooden caboose at high speed. There were only minor injuries to the crews involved. Conductor Emil Berglin was in charge of Extra 5121 West. Engineer Elmer Walkup and Conductor Malcom McCauley were handling the local. This view shows what is believed to be wrecker no. 45. Wreckers 45 and 47, new 250-ton "Z Model" wreckers built by Industrial Brownhoist in 1945, were assigned to Missoula. They were two of the four largest wreckers (nos. 45-48) on the NP."
Click Image to Enlarge Image Record Data - RVN09635
Date: March 09, 1946 
Location: Drummond, MT
Photographer: Ron V. Nixon
Railroad: Northern Pacific Railway
Caption: "Extra 5121 West rear-ended the main line local, Extra 1816 West, at Drummon, MT. This accident resulted indirectly from the events surrounding the derailment of wrecker 47 east of Missoula (see RVN09581-09595). Missoula engineer Charles F. Reinke and his fireman had been on a layover in Helena when they were called to take Helena wrecker no. 37 to Missoula to help re-rail wrecker 47. In the meantime, officials decided to use a small wrecker from the Missoula car shop to assist wrecker 27 for that job, so Reinke and his fireman were stopped at Garrison and sent back to Helena. Then, after returning to Helena, they were called short of their legal rest period to handle Extra 5121 West. According to railroad officials, as Reinke approached Drummond he and his fireman had probably fallen asleep and missed block signals protecting the rear of Extra 1816 West. Extra 1816 West's conductor looked out the back of his caboose just in time to see the high speed approach of Extra 5121 West, so he ran into the nearby field. His brakemen were already on the ground giving signals for switching moves they were making at Drummond. The big Z-7 4-6-6-4 type locomotive plowed into the local's wooden caboose at high speed. There were only minor injuries to the crews involved. Conductor Emil Berglin was in charge of Extra 5121 West. Engineer Elmer Walkup and Conductor Malcom McCauley were handling the local. This view shows what is believed to be wrecker no. 45. Wreckers 45 and 47, new 250-ton "Z Model" wreckers built by Industrial Brownhoist in 1945, were assigned to Missoula. They were two of the four largest wreckers (nos. 45-48) on the NP."
Click Image to Enlarge Image Record Data - RVN09637
Date: March 09, 1946 
Location: Drummond, MT
Photographer: Ron V. Nixon
Railroad: Northern Pacific Railway
Caption: "Extra 5121 West rear-ended the main line local, Extra 1816 West, at Drummon, MT. This accident resulted indirectly from the events surrounding the derailment of wrecker 47 east of Missoula (see RVN09581-09595). Missoula engineer Charles F. Reinke and his fireman had been on a layover in Helena when they were called to take Helena wrecker no. 37 to Missoula to help re-rail wrecker 47. In the meantime, officials decided to use a small wrecker from the Missoula car shop to assist wrecker 27 for that job, so Reinke and his fireman were stopped at Garrison and sent back to Helena. Then, after returning to Helena, they were called short of their legal rest period to handle Extra 5121 West. According to railroad officials, as Reinke approached Drummond he and his fireman had probably fallen asleep and missed block signals protecting the rear of Extra 1816 West. Extra 1816 West's conductor looked out the back of his caboose just in time to see the high speed approach of Extra 5121 West, so he ran into the nearby field. His brakemen were already on the ground giving signals for switching moves they were making at Drummond. The big Z-7 4-6-6-4 type locomotive plowed into the local's wooden caboose at high speed. There were only minor injuries to the crews involved. Conductor Emil Berglin was in charge of Extra 5121 West. Engineer Elmer Walkup and Conductor Malcom McCauley were handling the local. This view shows wrecker no. 47 and what is believed to be wrecker no. 45. Wreckers 45 and 47, new 250-ton "Z Model" wreckers built by Industrial Brownhoist in 1945, were assigned to Missoula. They were two of the four largest wreckers (nos. 45-48) on the NP."
Click Image to Enlarge Image Record Data - RVN09647
Date: March 27, 1946 
Location: Missoula, MT
Photographer: Ron V. Nixon
Railroad: Northern Pacific Railway
Caption: "Second No. 2, a section of the eastbound North Coast Limited, prepares for departure from Missoula, Montana. Engineer Albert A. Melton is in charge of engine no. 5134, a Class Z-8 4-6-6-4 locomotive. Engineer Melton established his fireman's seniority date on August 26, 1905, and was promoted to engineer on January 1, 1910."
Click Image to Enlarge Image Record Data - RVN09664
Date: April 07, 1946 
Location: Bonner, MT
Photographer: Ron V. Nixon
Railroad: Northern Pacific Railway
Caption: "Second No. 1, a section of the westbound North Coast Limited powered by Class Z-8 4-6-6-4 no. 5134, passes the Deer Creek Road grade crossing at high speed--proabably around 80 miles per hour. Engineer Albert A. Melton is at the throttle of no. 5134. His fireman's date is August 25, 1905, and he was promoted to engineer on January 1, 1910. This location is about milepost 115 on the Rocky Mountain Division between Bonner and Missoula. Bonner is located at milepost 113.2 and Missoula is located at milepost 119.4. This was a high speed double track line, and westbound passenger trains typically ran as fast as possible between Bonner and Missoula. Operating rules allowed regular (scheduled) trains to arrive at stations early, but not to leave early. By passing the last station (where time was shown in the Employee's Timetable) prior to a scheduled stop at the highest possible speed, a locomotive engineer could make up a little time if he was running late, or he could arrive a little early at the scheduled stop so as to allow more station dwell time. The track closest to the camera is the electrified line of the Milwaukee Road, which closely parallels the NP line at several points between Garrison and Missoula."
Click Image to Enlarge Image Record Data - RVN09668
Date: April 17, 1946 
Location: Burke, ID
Photographer: Ron V. Nixon
Railroad: Union Pacific Railroad
Caption: "Street in Burke, Idaho. The track extending along the street is that of the Union Pacific Railroad."
Click Image to Enlarge Image Record Data - RVN09677
Date: April 17, 1946 
Location: Burke, ID
Photographer: Ron V. Nixon
Railroad: Union Pacific Railroad
Caption: "Street scene in Burke, Idaho. Union Pacific track extends along street."
Click Image to Enlarge Image Record Data - RVN09678
Date: April 17, 1946 
Location: Burke, ID
Photographer: Ron V. Nixon
Railroad: Union Pacific Railroad
Caption: "Street scene in Burke, Idaho. Union Pacific track extends along street."
 Page 19 of 39back 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 next
    Ron V. Nixon Collection - Museum of the Rockies, Montana State University - Bozeman